cve.bz

oracle primavera p6 enterprise project portfolio management vulnerabilities, newest first

Filter

By year: all 2026 2025 2024 2023 2022 2021

  1. 5.4CVE-2025-50061EPSS 0.2%

    Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: Web Access). Supported versions that are affected are 20.12.0-20.12.21, 21.12.0-21.12.21, 22.12.0-22.12.1…

  2. 5.4CVE-2025-21558EPSS 0.3%

    Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: Web Access). Supported versions that are affected are 20.12.1.0-20.12.21.5, 21.12.1.0-21.12.20.0 and 22.…

  3. 4.3CVE-2025-21528EPSS 0.2%

    Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: Web Access). Supported versions that are affected are 20.12.1.0-20.12.21.5, 21.12.1.0-21.12.20.0, 22.12.1…

  4. 5.4CVE-2025-21526EPSS 0.2%

    Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: Web Access). Supported versions that are affected are 20.12.1.0-20.12.21.5, 21.12.1.0-21.12.20.0, 22.12.1…

  5. 8.2CVE-2024-21095EPSS 0.5%

    Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: Web Access). Supported versions that are affected are 19.12.0-19.12.22, 20.12.0-20.12.21, 21.12.0-21.12.1…

  6. 7.5CVE-2020-36518EPSS 4.9%

    jackson-databind before 2.13.0 allows a Java StackOverflow exception and denial of service via a large depth of nested objects.

  7. 6.6CVE-2021-44832EPSS 98%

    Apache Log4j2 versions 2.0-beta7 through 2.17.0 (excluding security fix releases 2.3.2 and 2.12.4) are vulnerable to a remote code execution (RCE) attack when a configuration uses a JDBC Appender with a JNDI LDAP data source URI when an at…

  8. 4.3CVE-2021-2386EPSS 0.7%

    Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: Web Access). Supported versions that are affected are 20.12.0-20.12.3. Easily exploitable vulnerability al…

  9. 6.4CVE-2021-2366EPSS 0.6%

    Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: Web Access). Supported versions that are affected are 17.12.0-17.12.20, 18.8.0-18.8.23, 19.12.0-19.12.14 a…

  10. 6.5CVE-2020-5421EPSS 12%

    In Spring Framework versions 5.2.0 - 5.2.8, 5.1.0 - 5.1.17, 5.0.0 - 5.0.18, 4.3.0 - 4.3.28, and older unsupported versions, the protections against RFD attacks from CVE-2015-5211 may be bypassed depending on the browser used through the us…

  11. 5.9CVE-2020-14706EPSS 1.1%

    Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: Web Access). Supported versions that are affected are 17.1.0.0-17.12.17.1, 18.1.0.0-18.8.19 and 19.12.0-19…

  12. 5.4CVE-2020-14653EPSS 0.8%

    Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: Web Access). Supported versions that are affected are 16.1.0.0-16.2.20.1, 17.1.0.0-17.12.17.1 and 18.1.0.0…

  13. 9.8CVE-2020-10683EPSS 7.3%

    dom4j before 2.0.3 and 2.1.x before 2.1.3 allows external DTDs and External Entities by default, which might enable XXE attacks. However, there is popular external documentation from OWASP showing how to enable the safe, non-default behavi…

  14. 5.4CVE-2020-2706EPSS 0.9%

    Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: Project Manager). Supported versions that are affected are 16.2.0.0 - 16.2.19.3, 17.12.0.0 - 17.12.17.0, 1…

  15. 6.5CVE-2020-2594EPSS 0.7%

    Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: Project Manager). Supported versions that are affected are 16.2.0.0 - 16.2.19.3, 17.12.0.0 - 17.12.17.0, 1…

  16. 5.4CVE-2020-2707EPSS 0.7%

    Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: WebAccess). Supported versions that are affected are 15.1.0.0-15.2.18.7, 16.1.0.0-16.2.19.0, 17.1.0.0-17.1…

  17. 7.3CVE-2020-2556EPSS 0.4%

    Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: Core). Supported versions that are affected are 16.2.0.0-16.2.19.0, 17.12.0.0-17.12.16.0, 18.8.0.0-18.8.16…

  18. 9.3CVE-2019-3020EPSS 1.5%

    Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: Web Access). Supported versions that are affected are 15.1.0-15.2.18, 16.1.0-16.2.18, 17.1.0-17.12.14 and …

  19. 6.8CVE-2019-2976EPSS 1.1%

    Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: Web Access). Supported versions that are affected are 17.1.0-17.12.12. Easily exploitable vulnerability al…

  20. 6.1CVE-2019-17091EPSS 2.5%

    faces/context/PartialViewContextImpl.java in Eclipse Mojarra, as used in Mojarra for Eclipse EE4J before 2.3.10 and Mojarra JavaServer Faces before 2.2.20, allows Reflected XSS because a client window field is mishandled.

  21. 4.3CVE-2019-2701EPSS 1.0%

    Vulnerability in the Primavera P6 Enterprise Project Portfolio Management component of Oracle Construction and Engineering Suite (subcomponent: Web Access). The supported version that is affected is 18.8. Easily exploitable vulnerability a…

  22. 4.7CVE-2019-2512EPSS 1.0%

    Vulnerability in the Primavera P6 Enterprise Project Portfolio Management component of Oracle Construction and Engineering Suite (subcomponent: Web Access). Supported versions that are affected are 8.4, 15.1, 15.2, 16.1, 16.2, 17.7-17.12 a…

  23. 9.8CVE-2018-19362EPSS 11%

    FasterXML jackson-databind 2.x before 2.9.8 might allow attackers to have unspecified impact by leveraging failure to block the jboss-common-core class from polymorphic deserialization.

  24. 9.8CVE-2018-19361EPSS 11%

    FasterXML jackson-databind 2.x before 2.9.8 might allow attackers to have unspecified impact by leveraging failure to block the openjpa class from polymorphic deserialization.

  25. 9.8CVE-2018-19360EPSS 11%

    FasterXML jackson-databind 2.x before 2.9.8 might allow attackers to have unspecified impact by leveraging failure to block the axis2-transport-jms class from polymorphic deserialization.

  26. 9.8CVE-2018-14719EPSS 9.7%

    FasterXML jackson-databind 2.x before 2.9.7 might allow remote attackers to execute arbitrary code by leveraging failure to block the blaze-ds-opt and blaze-ds-core classes from polymorphic deserialization.

  27. 9.8CVE-2018-14718EPSS 13%

    FasterXML jackson-databind 2.x before 2.9.7 might allow remote attackers to execute arbitrary code by leveraging failure to block the slf4j-ext class from polymorphic deserialization.

  28. 4.7CVE-2018-5407ExploitEPSS 3.4%

    Simultaneous Multi-threading (SMT) in processors can enable local users to exploit software vulnerable to timing attacks via a side-channel timing attack on 'port contention'.

  29. 5.9CVE-2018-0735EPSS 4.7%

    The OpenSSL ECDSA signature algorithm has been shown to be vulnerable to a timing side channel attack. An attacker could use variations in the signing algorithm to recover the private key. Fixed in OpenSSL 1.1.0j (Affected 1.1.0-1.1.0i). F…

  30. 6.1CVE-2018-3281EPSS 1.1%

    Vulnerability in the Primavera P6 Enterprise Project Portfolio Management component of Oracle Construction and Engineering Suite (subcomponent: Web Access). Supported versions that are affected are 8.4, 15.1, 15.2, 16.1, 16.2, 17.7 - 17.12…

  31. 6.1CVE-2018-3241EPSS 1.1%

    Vulnerability in the Primavera P6 Enterprise Project Portfolio Management component of Oracle Construction and Engineering Suite (subcomponent: Web Access). Supported versions that are affected are 8.4, 15.1, 15.2, 16.1, 16.2, 17.7 - 17.12…

  32. 7.5CVE-2018-1000632EPSS 6.6%

    dom4j version prior to version 2.1.1 contains a CWE-91: XML Injection vulnerability in Class: Element. Methods: addElement, addAttribute that can result in an attacker tampering with XML documents through XML injection. This attack appear …

  33. 5.4CVE-2018-1288EPSS 4.8%

    In Apache Kafka 0.9.0.0 to 0.9.0.1, 0.10.0.0 to 0.10.2.1, 0.11.0.0 to 0.11.0.2, and 1.0.0, authenticated Kafka users may perform action reserved for the Broker via a manually created fetch request interfering with data replication, resulti…

  34. 4.3CVE-2018-2963EPSS 1.1%

    Vulnerability in the Primavera P6 Enterprise Project Portfolio Management component of Oracle Construction and Engineering Suite (subcomponent: Web Access). Supported versions that are affected are 8.4, 15.x and 16.x. Easily exploitable vu…

  35. 4.4CVE-2018-2962EPSS 0.7%

    Vulnerability in the Primavera P6 Enterprise Project Portfolio Management component of Oracle Construction and Engineering Suite (subcomponent: Web Access). Supported versions that are affected are 8.4, 15.x, 16.x and 17.x. Difficult to ex…

  36. 6.1CVE-2018-2961EPSS 1.1%

    Vulnerability in the Primavera P6 Enterprise Project Portfolio Management component of Oracle Construction and Engineering Suite (subcomponent: Web Access). Supported versions that are affected are 8.4, 15.x, 16.x and 17.x. Easily exploita…

  37. 6.1CVE-2018-2960EPSS 1.1%

    Vulnerability in the Primavera P6 Enterprise Project Portfolio Management component of Oracle Construction and Engineering Suite (subcomponent: Web Access). Supported versions that are affected are 8.4, 15.x, 16.x and 17.x. Easily exploita…

  38. 5.9CVE-2018-11039EPSS 2.8%

    Spring Framework (versions 5.0.x prior to 5.0.7, versions 4.3.x prior to 4.3.18, and older unsupported versions) allow web applications to change the HTTP request method to any HTTP method (including TRACE) using the HiddenHttpMethodFilter…

  39. 7.7CVE-2018-2849EPSS 1.3%

    Vulnerability in the Primavera P6 Enterprise Project Portfolio Management component of Oracle Construction and Engineering Suite (subcomponent: Web Access). Supported versions that are affected are 16.2 and 17.1 - 17.12. Easily exploitable…

  40. 4.3CVE-2017-10160EPSS 1.4%

    Vulnerability in the Primavera P6 Enterprise Project Portfolio Management component of Oracle Primavera Products Suite (subcomponent: Web Access). Supported versions that are affected are 8.3, 8.4, 15.1, 15.2, 16.1 and 16.2. Easily exploit…

  41. 6.5CVE-2017-10131EPSS 1.0%

    Vulnerability in the Primavera P6 Enterprise Project Portfolio Management component of Oracle Primavera Products Suite (subcomponent: Web Access). Supported versions that are affected are 8.3, 8.4, 15.1, 15.2, 16.1 and 16.2. Easily exploit…

  42. 5.4CVE-2017-10046ExploitEPSS 3.9%

    Vulnerability in the Primavera P6 Enterprise Project Portfolio Management component of Oracle Primavera Products Suite (subcomponent: Web Access). Supported versions that are affected are 8.3, 8.4, 15.1, 15.2 and 16.1. Easily exploitable v…

  43. 6.5CVE-2017-10038EPSS 1.9%

    Vulnerability in the Primavera P6 Enterprise Project Portfolio Management component of Oracle Primavera Products Suite (subcomponent: Web Access). Supported versions that are affected are 15.1, 15.2, 16.1 and 16.2. Easily exploitable vulne…

  44. 8.1CVE-2017-3583EPSS 2.1%

    Vulnerability in the Primavera P6 Enterprise Project Portfolio Management component of Oracle Primavera Products Suite (subcomponent: Web Access). Supported versions that are affected are 8.3, 8.4, 15.1, 15.2, 16.1 and 16.2. Easily "exploi…

  45. 6.1CVE-2017-3579EPSS 1.4%

    Vulnerability in the Primavera P6 Enterprise Project Portfolio Management component of Oracle Primavera Products Suite (subcomponent: Web Access). Supported versions that are affected are 8.3, 8.4, 15.1, 15.2, 16.1 and 16.2. Easily "exploi…

  46. 9.9CVE-2017-3503EPSS 2.1%

    Vulnerability in the Primavera P6 Enterprise Project Portfolio Management component of Oracle Primavera Products Suite (subcomponent: Web Access (Apache Commons BeanUtils)). Supported versions that are affected are 8.3, 8.4, 15.1, 15.2, 16…

  47. 10.0CVE-2017-3324EPSS 2.0%

    Vulnerability in the Primavera P6 Enterprise Project Portfolio Management component of Oracle Primavera Products Suite (subcomponent: Web Access). Supported versions that are affected are 8.2, 8.3, 8.4, 15.1, 15.2, 16.1 and 16.2. Easily ex…

  48. 8.1CVE-2017-3263EPSS 1.3%

    Vulnerability in the Primavera P6 Enterprise Project Portfolio Management component of Oracle Primavera Products Suite (subcomponent: Team Member). Supported versions that are affected are 8.2, 8.3, 8.4, 15.1, 15.2, 16.1 and 16.2. Easily e…

  49. 5.4CVE-2016-5533EPSS 0.9%

    Unspecified vulnerability in the Primavera P6 Enterprise Project Portfolio Management component in Oracle Primavera Products Suite 8.4, 15.x, and 16.x allows remote authenticated users to affect confidentiality and integrity via unknown ve…

  50. 6.1CVE-2016-3573EPSS 1.7%

    Unspecified vulnerability in the Primavera P6 Enterprise Project Portfolio Management component in Oracle Primavera Products Suite 8.3, 8.4, 15.1, 15.2, and 16.1 allows remote attackers to affect confidentiality and integrity via vectors r…