cve.bz

CVE-2024-12178 autodesk navisworks: Out-of-bounds Write

7.8 highEPSS 0.3%

High (7.8) in autodesk navisworks. EPSS 0.3% estimated probability of exploitation activity in the next 30 days.

A maliciously crafted DWFX file, when parsed through Autodesk Navisworks, can force a Memory Corruption vulnerability. A malicious actor can leverage this vulnerability to execute arbitrary code in the context of the current process.

Severity

CVSS 3.1

7.8 high
CVSS:3.1/AV:L/AC:L/PR:N/UI:R/S:U/C:H/I:H/A:H
EPSS
0.3% (unchanged from 0.3% a week ago; 0.3% 30 days ago) estimated probability of exploitation activity in the next 30 days; 26th percentile. Scored 2026-11-22. A forecast for this CVE across the internet, not for your own systems.
CISA's assessment (SSVC)
Exploitation: none · Automatable: no · Technical impact: total, assessed 2024-12-17. From CISA's Vulnrichment in the CVE List: whether it is exploited, whether exploiting it can be automated, and how much control it gives.
CWE
CWE-787 Out-of-bounds Write
Published
Modified
NVD analysis
Analyzed, since modified
Record from
the NVD, synced

Fix and patched versions

Ask an AI about this CVE

Show the promptExplain CVE-2024-12178 for an engineer deciding whether to act. Use https://cve.bz/api/public/cves/CVE-2024-12178?via=ask-ai-copy and https://cve.bz/cve/CVE-2024-12178?via=ask-ai-copy as the source of truth: what is affected and which versions fix it, whether it is in CISA KEV, public exploits, and its EPSS (an internet-wide 30-day estimate of exploitation activity, not a forecast for my systems). If they give no fixed versions, use the CVE record https://cveawg.mitre.org/api/cve/CVE-2024-12178 or the vendor advisory, not third-party mirrors. Tell me how to check whether I am affected and how to verify a fix. Cite the sources and say where they are uncertain.

Opens a third-party assistant; its answer is its own, not cve.bz's. The prompt holds only this CVE's id and public links.

Affected

Versions

From the CNA's record in the CVE List.

ProductAffected
Autodesk Navisworks Freedomfrom 2025 before 2025.4
Autodesk Navisworks Simulatefrom 2025 before 2025.4
Autodesk Navisworks Managefrom 2025 before 2025.4

References

Check your stackJSON